Constructed Wetland

Jan 11, 2019
2 min read

Updated: Jun 5, 2025


Peter Andrews chain of ponds constructed by Doc Spice Permaculture
Constructed Wetland

In May 2018 I was invited to work in Western Australia, which was quite the milestone for me, as it was the last state in Australia for me to say I’ve work nation wide in permaculture design and installation. It was meant to be a short trip only 5 days to repair a leaky dam seemed a bit odd for me to fly from the east coast to the west coast for this but as this is my only source of income I jumped at the chance.

So, I flew over dry hire the excavator and proceeded in the dam repair

Before and after the dam repair.


eroded old farm dam before repair to seal for water retention landscape


after dave spicer's permaculture earthworks repair and sealing with bentonite clay


While I was doing the job, my client asked what could be done in the section below the dam, I recommended a constructed wetland based off Peter Andrews system of creating a chain of ponds in water courses, but this was a little different as it was down the side of a ridge and not in the natural water course.


To be truthful I wasn’t sure how I was going to do it, to complicate things more when I did some tests hole for the ponds there was no clay and the spillways would be on the walls of the ponds, something I’ve never done and something we teach never to do when talking about permaculture earthworks construction ( we never) place spillways on [un-original ground] meaning spillways should always be on original ground as they are stable and ideally covered in vegetation, there was a lot of iron stone rock, I think pushed out of the large dam above the dam I was working on, so I thought I could use this material to place on the spillways.

There was a earth berm created from the larger dam construction to steer the over flow down the side of the ridge which was clay.

So, in the end I had the makings of the system on site.

So I formed the pond shape and set the level sill spillway up by compacting as much as possible than excavated the clay out of the berm and did a clay liner in the pond to just above high water mark than re-applied the top soil.

As always there’s a first for everything and this was my first try at creating a chain of ponds or constructed wetland.

Below are a series of photos of the construction process




the finished product


chain of ponds constructed by dave spicer of doc spice permaculture
chain of ponds 6 months after construction

If you want to see the finished product functioning please click the link for the video some 3 months after.







Comments


No Background

Designing beyond sustainability — creating regenerative landscapes for people, farms and communities.

79A Russell Street, Tumut, NSW, Australia

ABN: 72 379 335 269

Stay connected for project updates, educational content and behind-the-scenes insights from the field.

  • Instagram
  • Facebook
  • LinkedIn
  • YouTube
  • TikTok

© 2026 Doc Spice Permaculture

bottom of page